Skip to main content
Issued in 24–48 Hours · Ready for Balady & Salamah

Certified Technical Report & Safety Plan Within 48 Hours

The #1 reason Balady or Civil Defense renewals stall is missing engineering documentation. Our Civil Defense accredited office issues technical reports and safety plans fast so your license never stops.

Two Distinct Documents

Technical Report vs. Engineering Safety Plan

Both are commonly needed for licensing—here is how each serves your compliance file.

Document 01

Certified Technical Report

Official engineering attestation issued by a Civil Defense licensed office proving compliance with SBC 801 & NFPA codes.

  • Technical audit of current facility safety status
  • Verification of installed fire & alarm systems
  • Deficiency identification & corrective actions
  • Report ID linked directly to Commercial Registration
  • Valid for 1 full year from inspection date
Document 02

Certified Engineering Safety Plan

Detailed CAD/BIM architectural safety layout mapping suppression, detection, and egress across every floor.

  • Exact locations of extinguishers & sprinklers
  • Smoke/heat detector & alarm panel network
  • Escape routes, emergency exits & assembly point
  • ISO 7010 directional & warning signage layout
  • Coverage & travel-distance calculations per zone
5-Step Fast Track

How We Issue Your Report In 24–48 Hours

  1. Share Details

    Provide activity type, area, address & CR number.

  2. Site Inspection

    Licensed engineer surveys systems & measures floor area.

  3. Technical Report

    Drafted to exact Civil Defense & SBC 801 terminology.

  4. Safety Drawing

    Precise distribution & egress layout prepared.

  5. Portal Delivery

    Uploaded officially—Report ID ready for Balady immediately.

Frequently Asked Questions

Clear Answers to Your Technical Questions

01

What is a Technical Safety Report and when is it required?

An official engineering document issued by a Civil Defense licensed engineering office confirming your facility meets safety standards. Required when renewing a Balady license without an active Salamah permit or during new licensing.

02

What is the difference between a Technical Report and a Safety Plan?

The Technical Report is a compliance evaluation text tied to your CR number. The Safety Plan is an engineering CAD/BIM drawing showing fire equipment and exit paths. Most approvals require both.

03

How fast can you issue a Technical Report?

Within 24–48 hours after the site visit (12–24 hours for urgent cases). Engineering Safety Plans take 3–5 business days depending on facility area.

04

How do I enter the Report Number in Balady?

Once issued, we give you the Report ID linked to your Commercial Registration. In Balady, select 'No' when asked for an existing safety permit and enter the Report ID—the portal verifies it automatically.

05

Does a Technical Report permanently replace a Civil Defense license?

No—it enables timely Balady commercial renewal when a Salamah permit isn’t yet active, allowing you to complete Salamah licensing smoothly afterward.

06

Can a Technical Report be issued if the facility has deficiencies?

Yes. The report documents current status and corrective recommendations; if extra gear is needed, we install it and update the file immediately.

07

How long is the Technical Report valid?

One full year from the inspection date.

08

Do you cover cities outside Riyadh?

Yes—through our Riyadh (RKHB4296) and Najran (NJMA7296) branches plus mobile teams in Jeddah, Dammam, Makkah, Madinah, Qassim, Tabuk, and Abha.